BS 5839-1 · -6 · -9 · BS 5266-1 · BS 8629 · BAFE · UK contractors
FireCompliance Pro runs the operational side of a fire safety business, across fire alarms, emergency lighting, evacuation alert, domestic fire detection and emergency voice comms: jobs, engineers, defects and certificates, all in one place. Every client gets a live compliance portal with their name on the door, so they stop waiting for the next visit to find out where they stand.
Client portal on every plan · No per-client fees
RRO 2005 · Article 17
Under the Fire Safety Order 2005 and the Building Safety Act 2022, the responsible person at every site you maintain is personally accountable for fire safety compliance. What do they usually get from their contractor? A certificate filed away after each visit, and no way to check where they actually stand in between.
Certificates buried in email threads. Defects mentioned verbally on site. No record of what's outstanding, what's overdue, or what a fire officer would find tomorrow morning.
Every certificate, every defect, every visit is visible the moment your engineer completes the job. A plain-English summary tells them exactly where they stand and what needs doing.
Fire safety systems must be maintained in efficient working order, and the responsible person must be able to demonstrate it.
The Building Safety Act raised the stakes: unlimited fines and custodial sentences for responsible persons who can't evidence compliance.
Periodic maintenance to a defined schedule, with documented results. Visit forms are built directly on Clause 43 and Annexes E & F.
NCR registers, calibrated test equipment, competency records, sub-contractor control, with scheme evidence kept audit-ready year round.
One platform · Two portals
Two portals share one live data layer. When your engineer closes a job, the certificate lands in the client's portal seconds later, with nothing for either side to file or chase.
Everything your office and your BAFE assessor need, in one place.
Roles: Contractor admin · Engineer
A plain-English, read-only view of their own compliance position, included as part of your service.
Role: Responsible person · No charge to your client
The centrepiece · AI estate health
The moment a responsible person opens their portal, the platform reads every site, defect, certificate and pending work order in their live estate, then writes a fresh briefing of exactly where they stand, citing the legislation that applies to them. No dashboards to decode. No jargon to translate.
Generated from the estate's data at that moment. An engineer closes a defect at 2pm and the summary knows by 2:01.
References RRO 2005 and BS 5839-1:2025 where they're legally relevant, so the person carrying the liability understands why it matters, not just what's red.
One tap regenerates the briefing, handy right before a board meeting or a fire officer's visit.
Across your three sites, your estate is largely compliant: Harbour View Hotel and Marina Court both hold in-date G6 Inspection & Servicing certificates. Quarterly maintenance is on schedule under BS 5839-1:2025 Clause 43.
One item needs your urgent attention. A Category 1 defect was logged at Pier House this morning: a sounder circuit fault affecting audibility on the second floor. Under Article 17 of the Fire Safety Order 2005, your duty to maintain the system in efficient working order means this should be rectified without delay. Work order WO-0142 is waiting for your approval below.
Marina Court carries two Category 2 defects from last month's visit. Neither is urgent, and both are quoted within the same work order, so approving it clears your whole outstanding list in one decision.
Harbour View Hotel · System FA-01
Engineer mobile view
Engineers see only their assigned jobs, on their phone, on site. Pick the visit type when you create the job and the form adapts: maintenance visits follow BS 5839-1 Clause 43 and Annexes E & F, commissioning follows the commissioning schedule, surveys stay light. Photos attach to defects as they're logged. Completing the job triggers the right certificate automatically. Install it to the home screen like a native app, and it keeps working when the signal drops in a basement plant room — job data and photos queue and sync the moment you're back online.
This is the part that makes the certificate mean something: the same workflow that produces it also drives a per-device test regime behind the scenes, tracking which devices are due and which alternation (annual or six-monthly) covers the rest — so what you're really selling isn't a PDF, it's a live asset register with a provable test history behind every one.
One platform · Every discipline
Most of your sites don't stop at the fire alarm panel, and neither does your compliance duty. FireCompliance Pro treats each discipline as a first-class system on the site: its own service schedule, its own visit forms, its own certificates, one client portal over all of it.
Full Annex G certificate set, Clause 43 visit forms, false alarm register. BAFE SP203-1 certificates for registered contractors.
Annual duration tests, completion & periodic inspection certificates, per-luminaire test records.
6-monthly & 12-monthly servicing, install-to-acceptance certificates, BAFE SP207. For buildings over 18 m.
Grades and categories for residential and HMO scope.
Fire telephones and disabled refuge systems, with their 6-monthly service regime.
BS 5839-1 · BS 5839-6 · BS 5839-9 · BS 5266-1 · BS 8629 · BAFE
From installation to handover and every service visit after, the correct certificate for the discipline is generated as a PDF the moment the work completes, filed in your library and instantly visible in your client's portal.
Upload your company logo once and it appears in the header of every certificate you issue, background removed automatically so it sits clean with no white box around it. BAFE-registered? Your own registration badge, with your number on it, renders in the footer too.
Every certificate carries a content hash and a QR code linking to a public verification page, so anyone can confirm it's genuine and untouched without logging in.
The certificate isn't the product — the engineer workflow behind it is. Every maintenance visit drives a per-device test regime that alternates annual and six-monthly coverage per BS 5839-1 Annex F, logs a pass/fail against each individual detector, sounder and call point, and flags what's still due. That's what lets you tell a client "100% of your devices were tested this year," device by device, not just "an engineer visited."
System designed to the agreed category
Stage 1Physical installation complete
Stage 2System tested and passing
Stage 3Formal acceptance by the responsible person
Stage 4Full installs and upgrades
Every contractor knows the end-of-job scramble: chasing drawings, hunting certificates, rebuilding a manual from memory the week the client asks for it. Run the install as a project and the pack assembles as you go — because every certificate, drawing and record is already filed against it.
Lightweight PRINCE2-style stages — survey, design, procurement, installation, commissioning, handover — each with a sign-off gate, planned dates against actual dates, and the jobs that belong to it. Nothing about how your engineers work changes: a project groups existing jobs, it doesn't replace them.
Design, installation, commissioning and acceptance certificates index themselves into the right section of the O&M register the moment they're signed off. They point at the certificate itself, so reissuing one never leaves the pack showing a superseded copy.
Price a change, put it to the client, and they approve or reject it in their own portal with the decision timestamped. Approved variations adjust the project's value and programme, so the job you get paid for is the job it actually became. Tasks, and a risk and issue register, sit alongside.
Most projects are upgrades, on sites that already carry a live system with years of service records, devices and certificates behind it. Close the project and the old system is retired in one step: it stops being scheduled, stops counting against the site's compliance status, and keeps every device, certificate, logbook entry and past visit exactly where it was — linked to the system that replaced it, so the site history reads as one continuous chain.
Everything in the platform
One data layer. Every module exists because a standard, a scheme, or a fire officer will ask for it.
Active jobs, open defects, certificate status and alerts, plus a whole-estate compliant/due-soon/overdue rollup, live.
Run a full install or upgrade as a project: stage gates, tasks, variation orders your client approves, a risk register, and an O&M manual that assembles itself as the work progresses.
Cat 1/2/3 categorisation, photo evidence, age tracking, client notification.
Full G1–G7 and BAFE library, PDF generation on job completion, hashed and publicly verifiable, one-click ZIP export.
Create, assign and track; structured visit forms per visit type.
Every detector, sounder and call point on the system, with a full per-device test history and CSV import. The software tracks which devices are due for their next test and alternates annual/six-monthly coverage per BS 5839-1 Annex F, so you can prove — device by device — that 100% were tested across the year, not just that a visit happened.
Response-time clock per callout against your contract SLA, with a live badge on the engineer's own job card.
The Clause 48 logbook clients and fire officers expect: problems, actions and visits in one running record per site.
Non-conformance records kept audit-ready for your BAFE assessment.
Calibration register with due dates, so no engineer is on site with out-of-cal kit.
Per system, per site: the record Clause 35 and insurers expect.
Invite, assign and manage your engineers, with a training matrix, DBS-check tracking and qualification evidence kept audit-ready. Deactivate a leaver and stop paying for them immediately.
The full estate hierarchy: every panel and system on each site, with a full visit and document history per site.
Quote with an attached PDF, clients approve or decline with a reason, every decision timestamped in a written trail that converts straight into a job.
YTD spend, budget position and invoice history. Fewer awkward calls.
A completed job becomes a real invoice with its own generated PDF. Set contractor-wide and per-client hourly/call-out rates, capture an engineer's on-site time and job materials, and see a profitability report by job and by job type — so you know which work actually makes money, not just which jobs got done.
Sub-contractor register plus O&M manuals and FRA reports in one library.
Cat 1 defects, work orders raised and approved, certificates issued, service due or overdue: emailed the moment they happen, to whoever needs to know.
No mockups
Every screen below is a live capture from a real contractor account: real jobs, real certificates, a real client portal. What you see is what you sign up for.
Ninety seconds, end to end. Every screen in it is a live capture of the running product — the same account the stills below come from.
Contractor dashboard
Client portal · Estate Overview
A real issued certificate
Audit-ready, not just paperwork
Test equipment register
Staff training matrix
Every certificate, publicly verifiable
Once a responsible person can see their own compliance position, they stop treating the next contractor's quote as interchangeable with yours. They start asking for FireCompliance Pro by name.
The client portal is included in your subscription and offered under your service. It makes your contract stickier, your service more premium and your renewals a formality.
Early access
We're onboarding a first group of contractors ahead of general availability. Join the waitlist and we'll be in touch about early access.
No card required · Set up in an afternoon · Cancel any time
We'll only use your email to contact you about FireCompliance Pro · Privacy policy
Prefer to talk first? Book a demo →